{"id":2514,"date":"2021-01-18T04:01:04","date_gmt":"2021-01-18T04:01:04","guid":{"rendered":"http:\/\/china-timing-pulley.xyz\/news\/?p=2514"},"modified":"2021-01-18T04:01:04","modified_gmt":"2021-01-18T04:01:04","slug":"power-units-for-double-scissors-lift","status":"publish","type":"post","link":"https:\/\/china-timing-pulley.xyz\/ru\/application\/power-units-for-double-scissors-lift\/","title":{"rendered":"Power UNITS FOR DOUBLE-SCISSORS LIFT"},"content":{"rendered":"<p>Common Description<br \/>Equipped together with the zero leak bidirectional checking sole-noid valves,  this  power  unit  is  developed for that operation of  two independent circuits.  Which  are  respectively for the key and subordinate platforms from the double scissors lift. Two  cut-off  valves are utilised for lowering the machine manually in situation of electrical power reduction. If <img decoding=\"async\" src=\"https:\/\/img.hzpt.com\/1207\/POWER%20UNITS%20FOR%20DOUBLE-SCISSORS%20LIFT.jpg\" align=\"right\" width=\"291\" style=\"padding:10px;\" alt=\"\" title=\"\">more independent circuits are expected for your application please get hold of us for availability.<br \/>Remark:  1. Please seek the advice of our sales engineer for your unique pump displacement, motor electrical power or tank capacity.<br \/>2. CSA or UL certified motors can be found on request.<br \/>Unique Notes<br \/>1.\tThe AC motor is of S3 duty cycle, which could only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.<br \/>2.\tClean each of the hydraulic elements concerned in advance of set up of  the electrical power unit.<br \/>three.\tViscosity of your oil shoud be 15~46 cst,along with the oil really should be clean and no cost of impurities,N46 hydraulic oil is suggested.<br \/>four.\tThe electrical power unit should be mounted vertically.<br \/>five.\tCheck the oil degree from the tank following the original operating in the electrical power unit.<br \/>six.\tOil changing is needed immediately after the initial 100 operation hrs,afterwards the moment every single 3000 hrs.<\/p>","protected":false},"excerpt":{"rendered":"<p>Common DescriptionEquipped together with the zero leak bidirectional checking sole-noid valves, this power unit is developed for that operation of two independent circuits. Which are respectively for the key and subordinate platforms from the double scissors lift. Two cut-off valves are utilised for lowering the machine manually in situation of electrical power reduction. If more [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"status","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2514","post","type-post","status-publish","format-status","hentry","category-uncategorized","post_format-post-format-status"],"_links":{"self":[{"href":"https:\/\/china-timing-pulley.xyz\/ru\/wp-json\/wp\/v2\/posts\/2514","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/china-timing-pulley.xyz\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/china-timing-pulley.xyz\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/china-timing-pulley.xyz\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/china-timing-pulley.xyz\/ru\/wp-json\/wp\/v2\/comments?post=2514"}],"version-history":[{"count":0,"href":"https:\/\/china-timing-pulley.xyz\/ru\/wp-json\/wp\/v2\/posts\/2514\/revisions"}],"wp:attachment":[{"href":"https:\/\/china-timing-pulley.xyz\/ru\/wp-json\/wp\/v2\/media?parent=2514"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/china-timing-pulley.xyz\/ru\/wp-json\/wp\/v2\/categories?post=2514"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/china-timing-pulley.xyz\/ru\/wp-json\/wp\/v2\/tags?post=2514"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}